Home / Calculators / Task Cost Calculator

Task Cost Calculator

Manual work has a hidden price tag. Enter your task details to see the true annual cost of repetitive work — and how much automation could save you.

Your Task Details

50×
500×
15 min
1 min120 min
$50/hr
$10/hr$200/hr
1 people
1 people50 people

The Real Cost

Monthly manual cost

$625

12.5 hrs/month in labor

Annual cost

$7,500

150.0 hrs wasted/year

Hours wasted / year

150.0 hrs

across your team

Potential savings (80%)

$6,000

with automation

This task costs your team $7,500 per year in manual labor (150.0 hrs wasted). Automating 80% of it could save $6,000/year. Calculate full ROI →

How the formula works

Monthly manual cost

(Times/month × Minutes/task × People) ÷ 60 × Hourly rate

Annual cost

Monthly cost × 12

Hours wasted / year

(Times × Minutes × People × 12) ÷ 60

Potential savings

Annual cost × 80% (typical automation reduction)

The 80% savings figure is a conservative industry estimate for routine, structured tasks. Savings vary based on task complexity and the automation tool chosen.